    Tactical was responsible for the procurement strategy, transaction and project management, superintendency, and contract administration for this stage of work. This package includes the design and construction of an upgrade to an existing section of Moorebank Avenue, extending it to 1.5 kilometres of dual carriageway, along with significant intersection upgrades to connect the precinct with Moorebank Avenue and the ANZAC Road intersection. The upgraded section will be subdivided and dedicated to TfNSW.

    The project will require the construction of a complete temporary diversion to allow continued operations on Moorebank Avenue while the upgrade works are undertaken, along with significant on-site stormwater infrastructure to support the proposed roadway and broader precinct.

    This package of work includes substantial augmentation of existing utilities infrastructure, including high voltage, water, and sewer systems, as well as the significant relocation of a 750mm sewer rising main for Sydney Water.

     

    Project Snapshot

    Sector: Infrastructure

    Location: Moorebank

    Client: LOGOS

    Value: AUD 1.5 billion

    Status: Current

    Speak with an Expert

    STEVE RYAN

    Australia

    STEVE RYAN

    DIRECTOR, AU

    Contact >
    JORDAN REYNOLDS

    New Zealand

    JORDAN REYNOLDS

    DIRECTOR, NZ

    Contact >

    Project Gallery

    Similar Projects

    < Back to Projects

    How can we help you?

    Get in Touch